Design Funnel Steps Easily

Docs
  1. Home
  2. Design Funnel Steps Easil...
  3. Design Your Funnel Steps ...
  4. How To Change Order Bump Position At The Checkout Step - Elementor

How To Change Order Bump Position At The Checkout Step – Elementor

In this guide, I will show you how to change your order bump position at the checkout step.

Since you are here, I assume you’ve already created a sales funnel with an order bump.

Now, follow the steps to learn how to change your order bump position.

You can change your order bump position in two ways.

  • Change the order bump position from the Checkout step
  • Change the order bump position with Elementor
  • Change Order Bump Position With Checkout Step

To change the order bump position with the Checkout step:

1. Click on the Checkout step from the WPFunnels dashboard to see some new options.

WPFunnels Checkout Step Options

2. Click the ‘Cart’ icon for the checkout step settings.

WPFunnels Checkout Step Edit Option

It will take you to the checkout page, and you will be on the Products tab by default.

3. You will see them here if you have already added products to your funnel.

WPFunnles Checkout Step Products

4. Click on the Order Bump tab to access this sales funnel’s Order Bump settings page. If you’ve already added an Order Bump product, it will be displayed here—simply click the Edit button to make changes. If no Order Bump has been added yet, click Add Order Bump to include your desired product.

WPFunnels Order Bump Settings

5. Now, select the Order Bump Position and change it to where you want to place the offer at checkout.

WPFunnels Change Order Bump Position

6. Click on the Save Changes button

WPFunnels Update Order Bump Information

Now, you can check the new position of your order bump by clicking on the View button from your Funnel canvas page.

  • Change Order Bump Position With Elementor

Follow the steps below to learn how to change the order bump position with the Elementor page builder. On the funnel canvas, click on the Checkout step and then click on the Edit option at the bottom of the Checkout step.

WPFunnels Checkout Step Edit Option

This will take you to the Checkout page editor.

Edit Checkout With Elementor

Now scroll down and click on the Checkout form, and the Edit Checkout widget will appear on the left.

WPFunnels Checkout Widget in Elementor

From the Edit Checkout widget, select the Order Bump Position and change it to where you want to place the offer at checkout.

WPFunnels Change Order bump Position in Elementor

Now, click on the Update button after you finish.

Chenge Order bump Position in Elementor - Save

Now, to see your new order bump position, click on the Preview button, and a new tab will open with the Checkout page design.

WPFunnels Checkout Step Preview

That’s it; you can change the order bump position anytime.

How can we help?

×